Due to full production cycle economy for the client makes up to 30% of order value.
We can make the most difficult metal structures with high precision due to professionalism of the engineering department and modern metalworking plant equipment of the leading Russian and foreign producers.
The quality control department and laboratory control process quality of released production and trace all stages of technological process.
Tests of materials used for production of all types of structures are carried out by the laboratory (cement, fillers, reinforced steel, rolled steel, welding materials, etc.).
Acceptance tests of finished products by the geometrical sizes, the provision of embedded parts, are carried out by the laboratory. According to requirements of standard documentation, periodic tests of designs for durability, rigidity and crack resistance are carried out.
The quality certificate is issued for each type of production to the consumer. The product doesn't leave from the plant without Quality Control Department stamp.
The plant capacities ensure trouble-free operation in the round-the-clock mode and production according to all relevant normative documents.
The total plant area is 360 000 sq.m.
Learn
everything about the company
and production
from our presentation
“Sila Sibiri” (“The Force Of The Siberia”)
Production and delivery of unique concrete weighting compounds to construction of the main gas pipeline “Sila Sibiri”. This line will transport gas of the Yakut and Irkutsk centers of gas production to Russian consumers in the Far East and for export to China.
The Power Line Kharanorskaya Hydroelectric Power Station - Bystrinsky Mining And Processing Plant
Production And Delivery Of Trussed Power Transmission Poles And Reinforced Concrete Foundations.
The route of the new power transmission line passes across the mountain area with height differences up to 690 meters. When producing and constructing the power transmission lines the increased seismicity (up to 7 points) and also danger of a soil frost boil were considered.
The Power Transmission Line Ust Kut - Kirensk
Reinforced Concrete Products, Trussed Power Transmission Poles And Centrifugated Support Of The Power Line.
The plant is a supplier of products for the EuroSibEnergo Group. We traditionally supply the Irkutsk power supply system with our products.
Main Power Transmission Lines
Production And Delivery Of A Spatial Metal Structures, Trussed , Multisided And Centrifugated Power Transmission Poles; Reinforced Concrete Products. Services In Hot Galvanizing Of A Metal Structures.
The Irkutsk plant supplies with the production key links of the Unified Energy System of Russia, among which Main Power Networks of The Siberia, the West Siberian enterprise of the main power networks, the Krasnoyarsk enterprise of the main power networks, the Khakass enterprise of the main power networks, the Transbaikal enterprise of the main power networks.
Reconstruction Of The Baikal Highroad
Procurement Of The Baikal Highroad Reconstruction. Development And Production Of A Typical Drainage Pipes, Trussed Power Transmission Poles, Reinforced Concrete Products; Transfer Of Freights.
The plant designed and made original steel concrete shuttering, made mass production of big road drainage systems. The plant solved problems of materials transfer which arrived from other regions of the country for reconstruction of the Baikal highroad by means of own transport and logistic capacities.
Reconstruction Of The Irkutsk Airport
Transfer Of 30 000 Tons Of Crushed Stones (Road Metal)
Our plant delivered 500 cars of the special crushed stones (road metal) from Krasnoyarsk to the Irkutsk Airport in one month. Two locomotives and special equipment had been involved, the work was conducted in the round-the-clock mode.
Shivee-Ovoo Coal Mine
Trussed and centrifugated power transmission poles.
The MCS INTERNATIONAL company is the regular foreign customer of the plant since 2002. Among objects: electrification of Shivee-Ovoo coal mine in the Gobi Desert, the power line Bulgan - Muren, the power line Arvaykheer - Bayanteeg – Bayankhongor.
The Wind Power Plant Salkhit
Production and delivery of centrifugated power transmission poles.
Supply of the country's first wind power plant "Salkhit", with 50megawatt (MW) of power per unit. It was the biggest power object of Mongolia for the last 30 years. The station was put into operation in 2013.
ооо “Irkutskstalbeton”
Irkutsk
664056, Staro-Kuzmikhinskaya st., 91
+7 (3952) 48 66 06
Прайс–лист обновляется.
Узнать стоимость продукции вы можете по телефону
+7 (3952) 48 66 06